St George Hospital

(IN PROGRESS) Frame-Tek is supplying a range of prefabricated façade support framing systems for multiple areas of the St George Hospital redevelopment. Our Optim Series off-slab framing is installed on the upper levels to support cladding, while our Zenith Series slab-to-slab framing is used on the lower levels to support the brick façade. In addition, […]
Griffith Hospital

Frame-Tek designed, engineered, and supplied our Zenith Series prefabricated façade support solution for Griffith Hospital. The frames were delivered to site with back-pan rain screens pre-sealed and screwed in place, allowing the building to be closed up faster and enabling internal trades to start earlier.
Logan Hospital

As part of the Logan Hospital Expansion, Frame-Tek delivered a smart prefabricated solution using our slab-to-slab Zenith Series framing to support the cladding and sunshades around the building perimeter. Through value-engineering, we replaced the originally specified structural steel posts beside each window with heavy-gauge jamb studs. Additionally, we supplied panelised framing in place of heavy […]
Blacktown Hospital Redevelopment 1 & 2

Frame-Tek designed, engineered, and supplied our Off-Slab Optim Series framing system for the Blacktown Hospital redevelopment. The prefabricated pre-rain screen façade enabled the builder to close the building faster, allowing internal works to commence sooner and improving overall project efficiency.