Frame-Tek partnered with Solarcert Building Designs to deliver a custom-engineered Accent Series framing solution for GTW House in Fyshwick. The framing was designed to connect directly to the concrete structure, simplifying installation and reducing on-site labour.
Our system provided a clean, efficient framing method tailored to the building’s design requirements, ensuring a smooth install and seamless integration with the overall structure.






